Image Gallery / Project References
Ecological refurbishment

The goal and result of this implementation was a roof renovation with fully integrated thermal insulation, solar thermal,
photovoltaics and a roof overhang that guarantees accessibility without being affected by rain and snow.
Planning and concept by HMD.
This original concept and implementation in 2011 has stood the test of time until today!
In the meantime, know-how in large-scale photovoltaic systems (open spaces, on flat roofs of shopping centres, etc.) has been added!
photos: HMD
« Previous Image | 13 Of 35 | Next Image » |
Back |